At long last the main base has been laid today!!! See and download the full gallery on posterous Sent from my iPhone4. Posted via email from Matt Takhar’s posterous
Sent from my iPhone4.
At last we have concrete in the ground! See and download the full gallery on posterous Sent from my iPhone. Posted via email from Matt Takhar’s posterous
Sent from my iPhone.
The building inspector says YES!!! At last after what feels like an epic journey the local council has finally signed off on the foundations thanks to WSL! The concrete is being poured tomorrow. Drain now lowered Pipe work replaced and boxed The equipment ready for the next stage Blocks hiding! Impressive bracing! It looks a [...]
Latest photos from another days work by WSL. The building inspector is coming out today! See and download the full gallery on posterous Sent from my iPhone. Posted via email from Matt Takhar’s posterous
Sent from my iPhone.
It looks a mess but its 10 times better than it was! WSL to the rescue! See and download the full gallery on posterous Posted via email from Matt Takhar’s posterous
Saturday 22nd May is going to be a day to remember. We spent all day finishing the foundations to the new spec, 1.5 meters deep by 600mm wide – 7am to 5pm – the hottest day of the year so far! Then at 5:10 – just 10 minutes after we finished for the day and [...]
Is it me or is this world going mad!?! My friendly building inspector has just informed me our foundations needs to be deeper, a lot deeper, very very very deep.. 2.7 meters kind of deep. Yes 2.7 meters, 2700 cm, 106 inchs, 8.8 feet… argh! Apparently its because of the hedge and the clay. It [...]
Download now or watch on posterous IMG_0211.MOV (9861 KB) A short clip showing the results of our hard work over the last three weekends. Thanks to, Dad, Morris and Mark…. oh and Sarah for providing food, drink and looking after the kids! Posted via email from Matt Takhar’s posterous
A short clip showing the results of our hard work over the last three weekends.
Thanks to, Dad, Morris and Mark…. oh and Sarah for providing food, drink and looking after the kids!Another weekend digging in the garden! Summary Lots of clay! Removed the bottom of swimming pool to find: Thick rubber 1 inch of sand 6 inches of concrete! Another Kango to remove 6 inch thick concreate, about ten feet worth Finally hit the right level 1000 – 1100 deep Grab lorry number 3 on order! [...]
- Lots of clay!
- Removed the bottom of swimming pool to find:
- Thick rubber
- 1 inch of sand
- 6 inches of concrete!
Okay, so who’s idea was this? We thought it would be a “good idea” to build an extension to our house. At the time of agreeing this I didn’t realise I would be doing all the ground work! Here are are few pictures from the first two weekends. May 1st : Lifted patio slabs – [...]
- May 1st : Lifted patio slabs – with kango (snapped two bits) – over 180 slabs!
- May 2nd: Lifted crappy pug and hardcore and all sorts of crap!
- May 3rd: Levelled base, 9 inches deep
- May 8th: Started digging main foundations
- May 9th: Continued digging foundations, flooded foundations from soak-away!